Log
Mar 13 – Jul 4 The last stretch of standalone development. From Initial commit to the final one (filling gaps in the README): 114 days, 81 commits. The last few days went to operations rather than features. Fixed a 500 on the badge share page, replaced a Vercel 15-minute cron blocked on the free tier with GitHub Actions, and wrote the deployment lessons down. No commits landed in that repository afterward.
Jul 7, 13:16 The whole service moved into COCOMSS as its /learn section. 45 whitepapers, the 3-level learning tree, section nav, term highlighting, Gemini citation-grounded Q&A with streaming, comprehension quizzes, and MetaMask + EIP-712 vouchers + the Base mainnet ERC-721 badge all moved as they were. API routes moved to /learn/api/*. COCOMSS's nginx proxies /api/* to FastAPI, so leaving them would have collided. Ads, analytics, price alerts, and the service's own header did not move. They were either duplicated by COCOMSS's infrastructure or unnecessary there.
Jul 7, 13:31–14:01 Three problems became visible only after the move.
- Replacing WD's own header with COCOMSS's nav took the badge gallery link with it. The gallery was reachable only from the post-mint confirmation text. 'My learning badges' was restored to the library header and the whitepaper top bar
- The KO/EN language toggle entry point disappeared for the same reason, and was re-attached in both places
- There were two price sources. The learning screens used CoinGecko while the core used exchange APIs. Mapped listed coins were switched to the selected exchange's KRW quote (Bithumb/Upbit toggle), with up/down colors unified to the Korean convention (red up, blue down)
Jul 7, 18:09 Only /learn ignored COCOMSS's deep-forest palette. The cause was a gray hex override on #learn-root in learn.css. A standard gray had been put there so html2canvas could bake badge images, and that gray was overriding the entire host palette. The hex values were replaced with deep forest and the orange accent went lime throughout. Only colors carrying meaning stayed, such as red/blue for price moves, green for correct answers, and emerald for wallet connection.
Jul 7, 18:30–18:58 CoinGecko was removed. After replacing the market-cap row (CoinGecko) on listed-coin cards with 24h volume (exchange data) to make attribution honest, CoinGecko HTTP calls went to zero. The catalog now surfaces only the 26 coins listed on Bithumb or Upbit (MKR and TON, listed on neither, were dropped). The unlisted and non-coin whitepaper files were kept, though. Only the library entry points were removed. Direct URLs and share links for already-issued badges still work.
Judgment
Key point
widigg as a standalone service ended because it had no next step. It was not about a missing feature. A learner who finished the whitepapers and earned the badge had nowhere to go. In COCOMSS's journey of learn → understand → verify → decide & practice, widigg fit the first slot exactly, and the other three were already built by other projects. Moving the features beat running one more service.
The migration did not finish at 13:16 when the code moved. The real time went into the next five hours. Entry points that left with the swapped-out header, one line of old CSS nullifying the new palette, and two price sources coexisting inside one service were still there. All of it remained after "everything's ported" had been said. The difficulty of a migration lies not in the features being moved but in the seams between the two services.
The rule for what stayed behind is worth recording too. Ads, analytics, price alerts, and the custom header were left out because they already existed in COCOMSS or served no purpose there. The migration took only what was needed instead of copying everything.
Charted Ahead
widigg's features ran in COCOMSS's /learn until COCOMSS shut down on October 30, 2026. In August, four security fixes (quiz-answer leakage, unbound voucher wallets, and more) were made there. The log under the name widigg ends here, and the record continues in the COCOMSS deck log. The full story of the merge is written separately in Four Projects Into One.