Series AIB10 Deck Log

~6 min read

Ending AIB10, and the 80 Days Without a Single Sign-up

In the 80 days after the September 8 launch there were zero outside sign-ups, and the service was shut down on November 26. The ten days after diagnosing 'no traffic' produced 58 commits, and the 19 days of short-form video promotion that followed brought no sign-ups either. Whether the service was needed was never answered.

UnderwayRetrospectiveValidationGo-to-Market

Log

Accounts and Watch went public on September 8, and the service was shut down on November 26. In the 80 days after launch there were zero outside sign-ups. Both accounts on record belonged to the operator, and the waitlist had zero entries. No visit from a search engine was found. Most requests to the server came from automated scanning bots.

Over the same period the scheduler was the one actually using the service. In the 26 days before shutdown the service account ran 265 searches and 268 Gemini calls. A person ran one search. Fixed cost is estimated at around 25 dollars a month.

A small number of browsers had the Chrome extension installed. The web-store developer dashboard holds 146 days of records, from July 2, when figures first appeared, to November 24. Weekly users were 1 to 3 in July and 1 to 4 in August. From September 1 they stayed between 4 and 6 without change, and the last count was 5. By the dashboard's definition this figure is the approximate number of Chrome browsers that loaded the extension in the past 7 days, including ones where it is disabled. It does not say whether a search was actually run. The operator's own installs are not separated out either. The store page was viewed 69 times over the 146 days. Install requests ran at around 1 a day through October 29 and were recorded at around 25 a day from October 30. This figure covers not only completed installs but also requests that failed or whose status is unknown. Weekly users did not rise over the same period. Where the requests came from was not identified.

MetricValue
Days in operation after launch80
Outside sign-ups0
Waitlist entries0
Search-engine visits0
Searches by a person (last 26 days)1
Extension weekly users (from September 1)4 to 6
Web-store page views (146 days from July 2)69
Searches by the scheduler (same period)265
Total commits116, of which 74 in September
Last deploymentSeptember 9

It began as a news-analysis assignment in a KDT (K-Digital Training) data analysis course. The assignment's scope ended at collecting news in a Jupyter notebook and showing a summary of the search results. Sentiment analysis and trend keywords, long wanted when searching news, were added on top, a front end was put on it, and the assignment was finished. The wish to run that result as a real service led to buying a domain and putting it on an AWS server. The first commit on March 31 marks that point. It was later released as a Chrome extension as well.

On August 19 the business-model document was written. It turned the product from a search tool into a monitoring subscription. The document included a validation plan that said to confirm demand before building. It also set a bar: if the waitlist stayed under 30, the target would be reconsidered. Implementation started the same day. Over two days Watch, period reports, send retries, and unsubscribe handling were built.

On August 22 the sentiment-model evaluation concluded that retraining was required. Accuracy on real news headlines was 0.391. That is nearly the same as the 0.382 from always answering "positive." The business-model document rated this model as the only moat. Its basis was a validation accuracy of 0.81 measured inside the training distribution. In that state the negative-surge alert, the core of the paid product, could not fire. Crossing the threshold would have required a real negative ratio above 100%. The evaluation sat in the repository but was never reflected in the business document. The model beat constant prediction through retraining on September 8. Even then there was nobody to receive the alert.

On September 4 three reports were written on market research and business viability. That is where zero sign-ups and zero waitlist entries were confirmed. The report wrote that the hypothesis had not yet been tested. The market research was not encouraging either. Search, summaries, trends, and scheduled alerts were already available for free. Only instant alerts and sentiment judgment carried a price. The single open spot was that no low-priced product bundled the two. But sentiment classification cost 267 won per user per month, so it was not a spot that a technical barrier could defend.

In the ten days after the reports, from September 5 to 14, 58 commits landed. That is more than the 41 of the preceding five months. Of these, 22 were features. Alert channels, PDF reports, mention-volume forecasting, bookmarks, listed-company tags, extension login, overseas news, and an English UI were built then. Paid plans and quotas and an invoice-draft tool already existed. At that point there was nobody to pay and nobody to receive alerts. Overseas news and the English UI were never deployed to production.

Checking whether anyone was using the service meant logging into the server and querying the DB by hand. There was no dashboard and no analytics tool. Access logs were kept for only 10 days. The check happened about once a month.

After September 14 there are no human commits. Code work stopped, but thinking about how to improve the service went on. For 19 days, from September 21 to October 9, short-form videos promoting the service went up on official Instagram and YouTube accounts. The videos were produced and published with the self-built TrendReport SNS. Over the 19 days of promotion the store page was viewed 9 times. That is fewer than the 21 of the preceding 19 days. Weekly users were 5 to 6, the same as before the promotion. Nothing led to a sign-up either. Visits on the web side cannot be checked for this period, because access logs were kept for only 10 days. Meanwhile the server ran untended for 73 days. The scheduler spent Gemini budget every day. The public server took automated scanning without patches. On November 16 a scanner called the login API and a real email was sent to an arbitrary address. On November 26 the logs were reviewed and the shutdown was decided. The data was backed up and the server resources were deleted. The domain was kept with only its mail-spoofing protection settings.

Judgment

Key point

There are two reasons for ending. There was no traffic, and the question of whether this service was needed found no answer. In 80 days no outside person signed up or tried to log in. From September 1 the extension's weekly users stayed at around 5 and did not grow. Listing on the web store and publishing a landing page were treated as the launch. A listing only puts the product on a shelf, and bringing people to it was separate work. The short-form promotion, started 13 days after launch and run for 19 days, produced no sign-ups either. Not one of the PR and marketing staff at small and mid-sized companies set as the target was contacted directly. Because it was never shown to the target, it ended without confirming whether the service was needed.

The starting point explains this result as well. The service did not start from a specific customer's problem. It was an assignment with the features its maker wanted added on, and the goal was to run it as a real service. That goal was already met once it was on a server and the extension was public. Who would use it was first decided in the business-model document on August 19, 141 days after the first commit. The goal changed from running a service to a subscription business, but the way of working stayed the same. Until mid-September, building and deploying were the only things that continued.

The order that had been set was not followed. The document said demand comes first, and implementation started the same day. Even after the September 4 diagnosis correctly named the lack of traffic, the first prescription was code. Feature work shows visible progress and can be controlled alone. Bringing people in is not like that. The fact that the ten days after the diagnosis had the most commits was the warning sign. Promotion started on September 21, a week after those ten days ended.

Promotion stayed at posting short-form videos. There was no direct conversation with a single person in the target group. No way to meet prospective customers was found. There was no conviction about the service and so no confidence, which made the search for a way more passive. When the promotion did not spread as hoped, the question arose of whether this service was needed. That question never found an answer. Without conviction the customers were not met, and without meeting customers no basis for conviction appeared.

The validation bar had a gap too. The bar of 30 waitlist entries rested on the premise that there were visitors. With zero visitors, 0 out of 30 says nothing. The sentiment-model evaluation was likewise not connected to the business document. The moat rating should have been corrected the day the evaluation came out.

Postponing the decision was also a cost. It was 73 days from the last commit to shutdown, and 48 days even counting from October 9, when the promotion stopped. All that time the server's cost and security risk were carried as before. No deadline or shutdown criterion had been written down at the start, so the unanswered state simply went on. Had the key number been somewhere visible every day, the decision would likely have come earlier.

Engineering was not the cause of the failure. Automatic suppression on bounces and complaints, signature-verified webhooks, per-address send limits, and the no-source-text-retention principle carry over to the next project. The September 4 report that ruled the product's own moat as rejected is also a record worth keeping. What fell short was the action after the diagnosis.

Charted Ahead

  • The next project builds its first feature only after talking with 10 people in the target group
  • It counts as a launch only when the path for showing it directly to the first 50 people is set on launch day
  • A deadline and a shutdown criterion are written before going public. For example, fewer than 10 outside active users four weeks after launch means shutting down or changing direction
  • The number of outside active users is kept somewhere visible every day
  • When the server cannot be tended for more than a week, the scheduler, outbound mail, and unused public exposure come down first
  • The Fleet card switches to Voyage Ended, with the period recorded from first commit (Mar 31) to the shutdown date (Nov 26)
  • The repository and the backup taken at shutdown remain. The service address no longer opens

Related

Portfolio'AIB10' — AI News Summarization & Sentiment AnalysisOperationsAIB10 — AI-powered news summarization and sentiment analysisJournalThe Single-Server Infrastructure Behind AIB10JournalAIB10's Logic Design, from Collection to AlertsJournalThe Features and Screens That Went Into AIB10JournalThe Three Weeks AIB10's Sentiment Model First Beat Constant Prediction