Log
The two weeks from July 2 to July 17 were the period the pipeline actually ran. From the first commit it was operated unattended, refreshed by GitHub Actions every weekday at 18:00 KST. An event DB of 578 entries across 13 categories, 15 auto-published reports (8 weekly, 6 monthly, 1 annual), 301 golden tests, and freshness guards over 42 datasets came out of that period. Of 135 commits, 38 were the bot's own updates.
On July 20 the updates stopped, and nobody knew. From that day it failed 32 times in a row without a single success: billing/quota blocks 10 times (Jul 20–31), a KeyError: 'category' from the universe expansion 14 times (Aug 3–20), billing blocks again 7 times (Aug 21–31), and one 40-minute-limit cancellation (Sep 1). The last successful update was July 17, and discovery came on September 4, 49 days later. A staleness banner had been added to the site on Aug 1, but a banner is a signal you only see if you go look. When the pipeline stops, the reason to look stops with it.
In August the research continued, unaware that the pipeline had stopped. Cluster correction on the pooled earnings test showed that "more tickers means more power" was wrong (Jul 31). The hand-picked ticker list turned out to be a source of survivorship bias, so the universe moved to point-in-time selection (Aug 1). In the final commit on Aug 29 a criterion was set at the boundary of risky strategies, and the criterion itself answered "unsatisfiable." The selection step had been, in effect, a coin flip (selection stability 29% and 25%, against a 70% bar).
The last inspection was on September 4. A full inspection confirmed the 32 consecutive failures, and the three code-side causes were fixed. The two workflows (daily-update, tests) were left manually disabled and not re-enabled. Everything repaired and nothing switched back on is how this project ends.
The final scorecard:
| Test | Result |
|---|---|
| 169 individual event days | 22 significant after correction — the largest: the Hormuz blockade at -11.65% (t=-8.7) |
| 397 scheduled announcements | same-day reaction within ±0.17% — the project's sharpest measurement |
| Earnings, 9 tickers | 8 tickers moved 1.6–6.3× their usual range on announcement day (q<0.05) |
| 13 category averages | 0 significant after correction |
| 14 strategy checks | 0 significant after correction — the last survivor, the overheat filter, fell at q=0.168 |
| Walk-forward backtest | every strategy trailed buy-and-hold (Sharpe 0.54 vs 0.87) |
Judgment
Key point
The reasons for ending come in three layers. First, the original goal of prediction failed explicitly. The goal had already been redefined from "predict" to "record" on July 15, and the final commit confirmed the strategy-selection step was no better than a coin flip. Second, the premise of unattended operation broke. GitHub Actions billing/quota blocks hit twice in two months, and it was no longer a pipeline that ran for free. Third, nobody knew any of it for seven weeks. When the watchman lives inside the thing being watched, they stop together. A stopped pipeline cannot send the alert that it has stopped.
That this project's results are negative results is nothing to hide. Zero significant category averages, zero strategies, prediction trailing buy-and-hold. Two months went into saying "not significant" precisely, multiple-comparison correction and all. The 22 documented incidents along the way (a lost surge alert, a future-dated publication, a test overwriting published artifacts undetected for 50 days) are all on record. This is worth more as a record than pretending the predictions worked.
One final lesson, though, belongs to the next projects. The staleness banner, the freshness guards, and the consistency checks all lived inside the pipeline. When the pipeline stopped wholesale, they stopped with it, and nothing spoke up. What's needed is a signal from outside that speaks first. That prescription is already being applied to the other projects.
Charted Ahead
- The repository and the data remain. The 578-entry event DB (2000–2026) and the URLs of all 15 published reports stay live
- The Fleet card switches to Voyage Ended, with the period recorded as 65 days, from first commit (Jul 2) to final inspection (Sep 4)
- The publish-boundary guard, the pipeline-sole-author rule, and "verify the diagnosis too" are disciplines built on this project that are now standard equipment on the others